We’re pleased to confirm that JS Production OÜ has successfully repaid Stage 6 in full — a total of €150,950 returned to investors.
What Was Stage 6 For?
As demand increased and industry lead times grew, JS Production needed to scale efficiently.
With the support of Maclear investors, they invested in:
- An automatic washing line — to speed up pre-treatment
- A metal blasting chamber — for stronger surface preparation
- A bridge crane — to handle heavier material loads in-house
The result: higher capacity, faster turnaround, and access to larger contracts.
All equipment is secured as collateral — over €550,000 in verified assets backing the loan.
Why It Matters
When metal coatings fail, the consequences are costly — from production delays to structural damage. That’s why companies across Europe are investing in reliable, industrial-grade protection.
Estonia’s construction and machine-building sectors are growing by 5%+ annually. JS Production is right at the center of this trend, offering a rare combination: fast service, competitive pricing, and proven quality. That’s what’s driving their growth — and strengthening the fundamentals of this project.
What’s Next
Stage 6 is closed and fully repaid. More stages and further cooperation are on the way.
Thanks to every investor who backed this round — your capital helped a real business scale at the right moment.
We’ll keep you posted on what comes next.